IBM's B2B
Integrator Upgrade
ComResource can upgrade your IBM B2B Integrator, non-container version, for a fixed price.
As long as your existing topology remains the same (cores, nodes, components, etc.), we can complete either an in-place or hybrid upgrade (hybrid leverages the existing database but allows a different app server).
Price is based on how many total nodes you are running in your environment:
- First node included in base price
- Each additional node is extra (prod or non-prod)
- Additional cost for each Perimeter Server being used
- Addition cost may apply for special circumstances (e.g. fixing current issues, large DB, external schedulers, third-party jars, custom services, etc.)
Analysis and Design
Document current and new system architecture
Create Upgrade and Test Plan
Perform and Upgrade on Test Environment
Execute system upgrade and
perform test plan
Document remediation and results
Perform Mock Upgrade on Production (if database is exceptionally large)
Execute system upgrade on copy of production database
Document results for required outage and remove
Perform Production Upgrade and Monitor
Execute system upgrade and validate
Monitor System for up to 3 days
What Your Upgrade
Process Will Look Like
Analysis and Design
Document current and new system architecture
Create Upgrade and Test Plan
Perform and Upgrade on Test Environment
Execute system upgrade and
perform test plan
Document remediation and results
Perform Mock Upgrade on Production (if database is exceptionally large)
Execute system upgrade on copy of production database
Document results for required outage and remove
Perform Production Upgrade and Monitor
Execute system upgrade and validate
Monitor System for up to 3 days
Over 30 years of helping companies transform and upgrade their business operations
Send us a note and we would be happy to chat with you!